Under the following conditions, a train that has experienced a cab signal, automatic train stop, or speed control failure may be dispatched from a turnaround point, governed by the rules that apply to an en route failure?

Prepare for the NORAC 300 Test. Study with flashcards and multiple choice questions, each question has tips and explanations. Get ready for your exam!

Multiple Choice

Under the following conditions, a train that has experienced a cab signal, automatic train stop, or speed control failure may be dispatched from a turnaround point, governed by the rules that apply to an en route failure?

Explanation:
When a train experiences a cab signal, automatic train stop, or speed control failure, dispatch from a turnaround point is allowed under en route failure rules only if the testing or status of the equipment aligns with the required testing window. The statement that the equipment has not received any cab signal test in the last 48 hours fits that rule, making the train eligible to be dispatched under those en route failure provisions. It reflects the condition that the equipment hasn’t been recently tested, which, under these rules, still permits dispatch from the turnaround point with the appropriate safeguards and follow-up actions. The other conditions don’t match this rule. Requiring a cab signal test within the previous 24 hours would impose a more stringent timing that isn’t the criterion described for en route failure dispatch. Limiting to maintenance yard operations excludes the en route scenario entirely. Requiring special authorization for passenger service adds an extra layer not specified by the en route failure rules in this context.

When a train experiences a cab signal, automatic train stop, or speed control failure, dispatch from a turnaround point is allowed under en route failure rules only if the testing or status of the equipment aligns with the required testing window. The statement that the equipment has not received any cab signal test in the last 48 hours fits that rule, making the train eligible to be dispatched under those en route failure provisions. It reflects the condition that the equipment hasn’t been recently tested, which, under these rules, still permits dispatch from the turnaround point with the appropriate safeguards and follow-up actions.

The other conditions don’t match this rule. Requiring a cab signal test within the previous 24 hours would impose a more stringent timing that isn’t the criterion described for en route failure dispatch. Limiting to maintenance yard operations excludes the en route scenario entirely. Requiring special authorization for passenger service adds an extra layer not specified by the en route failure rules in this context.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy